Skip to content
NEXT DAY DELIVERY AVAILABLE - SEE TERMS AND CONDITIONS
NEXT DAY DELIVERY AVAILABLE - SEE TERMS AND CONDITIONS
How to Install Container Windows: Step-by-Step Guide

How to Install Container Windows: Step-by-Step Guide

Back to Blogs
How to Install Container Windows: Step-by-Step Guide

How to Install Container Windows: Step-by-Step Guide

Installing shipping container windows in shipping containers can improve natural light, airflow, and functionality. It also helps with moisture control, reduces condensation, and meets safety codes for emergency exits. However, proper planning and safety precautions are essential to maintain structural integrity.

Key Steps:

  1. Safety Checks: Assess structural integrity, avoid load-bearing walls, and use protective gear.
  2. Tools & Materials: Angle grinder, MIG welder, dual-pane windows, marine-grade sealant.
  3. Preparation: Mark window placement, set up a clean workspace, and provide temporary structural support.
  4. Installation: Cut openings, weld steel frames, install and seal windows with butyl tape and silicone.
  5. Testing & Maintenance: Perform water and air tests, inspect seals bi-annually, and replace components as needed.

DIY vs Professional:

Aspect DIY Professional
Cost (4 windows) £1,200–£1,500 £1,800–£2,500
Time per window 4–6 hours 2 windows/hour

Proper installation ensures safety, durability, and long-term performance. Follow these steps to enhance your container space effectively.

How to Install Wood Window Bucks into a Shipping Container

Required Tools and Materials

Before starting the installation, make sure you have everything you need for a smooth and accurate process.

Tools List

Here’s a breakdown of the essential tools you'll need:

Cutting Tools

  • Angle grinder (minimum 4.5") with metal-cutting discs
  • Reciprocating saw equipped with bi-metal blades

Measuring and Marking Tools

  • Digital level
  • Metal square
  • Measuring tape
  • Metal marking pencils

Installation Tools

  • MIG welder for securing the frame
  • Spark-resistant vacuum to handle debris
  • Sealant gun for applying weatherproofing materials

Materials List

Using high-quality materials ensures durability and optimal performance for your container windows.

Frame Components

  • 2x4-inch steel reinforcements for added structural strength
  • Pre-fabricated framing kits
  • Marine-grade silicone sealant for long-lasting sealing

Window Units

  • Dual-pane argon-filled windows with tempered safety glass (reduces condensation by 60% compared to single-pane)

Sealing and Protection Supplies

  • 5-7 cutting discs for each window opening
  • Rust-inhibiting zinc chromate primer to prevent corrosion
  • Butyl tape for an additional moisture barrier
  • Closed-cell spray foam insulation for effective sealing

Self-Install vs Hiring Pros

Deciding whether to install the windows yourself or hire professionals depends on factors like cost, time, and project complexity.

Cost Comparison for 4 Windows

Aspect DIY Professional
Labor Cost £400+ tool investment £75-£125/hour
Time per Window 4-6 hours 2 windows/hour
Total Cost (4 windows) £1,200-£1,500 £1,800-£2,500

For structural changes affecting more than 40% of the wall area or when local codes require certified work, professional installers are a must.

On simpler projects, DIY can save you £600-£1,000 on a 4-window installation.

Once you’ve gathered the tools and materials, follow the next steps to prepare your container for installation.

Container Preparation Steps

Getting your shipping container ready is an important step for successful window installation. It involves detailed planning and accurate measurements to maintain the container's strength and ensure the windows are properly placed.

Window Placement Guide

Once you've completed the safety checks from Section 2, start by examining the container's structural components. When deciding where to place windows, avoid removing more than 20% of the wall area on any side to keep the structure stable.

To mark the window locations accurately:

  • Use window templates provided by the manufacturer that match the frame specifications.
  • Drill pilot holes at the corners using 3/8" cobalt steel hole saw bits.

Work Area Setup

A clean and safe workspace is key to precise installation. Use the spark-resistant vacuum from your tools list to keep the area tidy and follow these safety measures:

Ventilation and Air Quality

  • Set up industrial exhaust fans to create negative air pressure.
  • Use HEPA-filtered vacuums to maintain clean air.

Safety Equipment Placement

  • Place fire extinguishers within 25 feet of the work area.
  • Install high-heat-rated welding screens to protect against sparks.

Structural Support

Provide temporary support by installing 2x4 lumber or Unistrut channels at 45-degree angles, keeping them within 12 inches of the planned cut lines. For openings larger than 36 inches, reinforce the area with horizontal steel C-channels above and below the window spot.

Environmental Controls

Control the work environment to avoid issues like moisture or poor conditions:

  • Wind over 15 mph: Set up windbreaks.
  • Temperatures below 40°F: Preheat the workspace.
  • Humidity over 60%: Use dehumidifiers.
  • UV exposure: Mark areas with UV-resistant markers.
sbb-itb-276dc65

Window Installation Steps

With your container ready, it's time to move on to installing the window. This step demands precision to ensure a proper seal and smooth operation.

Cutting the Opening

Start by securing templates with a 2x4 to straighten the corrugations for clean cuts. Here's how to proceed:

  • Mark and double-check: Use a laser level to ensure your measurements are accurate and perfectly aligned.
  • Cut the opening: For multiple windows, a plasma cutter works best. For single installations, an angle grinder is a good option.

Frame Installation

Frame Type Ideal Use Advantages
Steel Box-Section (50x100mm) High-security needs Strong and weldable

Follow these steps to install the frame:

  • Position the frame: Leave a 1/8" gap on all sides for a proper fit.
  • Hold it in place: Use clamps to temporarily secure the frame and check alignment.
  • Weld the frame: Use a 230V MIG welder at 130-150 amps, welding at 6-inch intervals for stability.

Window Mounting and Sealing

Sealing the window correctly is key to keeping water out. Here's how to do it:

  1. Apply butyl rubber tape around the frame's perimeter.
  2. Mount the window unit, ensuring it's level and aligned.
  3. Seal the edges with Dow Corning 795 marine-grade silicone.

For extra protection:

  • Leave a 3mm gap for expansion and fill it with flexible polyurethane sealant.
  • Add EPDM rubber gaskets between the frame and the window.

Once installed, test the window to ensure it's properly sealed:

  • Water test: Use a pressure washer at a 45° angle (30 PSI for 15 minutes) to check for leaks.
  • Air test: A smoke pencil can help detect any air gaps around the edges.
  • Stability check: Apply moderate pressure to ensure the window doesn't shift.

After completing these steps, proceed to test the seals and structural integrity as detailed in the next section.

Testing and Upkeep

Once windows are installed and sealed, it's important to ensure they perform as intended. Here's how to test and maintain them effectively:

Water and Security Checks

To confirm security and durability, conduct these tests:

Test Type Standard Acceptance Criteria
Lock Mechanism 250N lateral pressure No deformation or failure
Frame Welds Ultrasonic testing No discontinuities
Impact Resistance 50J energy (EN 356) No penetration or cracking

If you notice any leaks during testing, address them immediately to avoid further issues.

Regular Maintenance Tasks

Keeping up with maintenance helps ensure the windows stay functional and durable. Studies indicate that 68% of container window installations encounter common issues.

Bi-Annual Checks (Spring/Fall):

  • Examine the sealant for cracks and check window alignment.
  • Apply silicone spray to lubricate moving parts.
  • Use a stiff brush to clear out drainage holes.

Annual Maintenance:

  • Use thermal imaging to identify insulation gaps.
  • Clean and inspect drainage weep holes, adding 0.5mm stainless steel mesh filters if needed.

Replacement Schedule:

  • Sealants: Replace every 3–5 years.
  • Gaskets: Replace every 5–7 years.
  • Dual-pane glass: Replace every 10–15 years.

For windows installed in coastal areas, add sacrificial anode strips near the frames to combat corrosion. This complements the zinc chromate primer applied during installation. Additionally, maintain interior humidity below 60% with passive ventilation systems to prolong the life of the components.

"Proper maintenance documentation is crucial for warranty compliance", according to ASTM E1105 field testing guidelines.

Always keep dated records of all maintenance work to ensure warranty coverage.

Summary

By following the outlined steps, you can ensure your container windows meet both structural and performance standards. A well-executed window installation not only guarantees safety and functionality but also saves time - professionals can complete a window in about 45 minutes, compared to 2-3 hours for DIY efforts.

Core Requirements

A successful installation relies on precision and high-quality materials:

  • Maintain at least an 18-inch clearance between multiple window openings.
  • Cut openings 10mm smaller than the frame dimensions to allow for thermal expansion.
  • Use box-section steel frames (50mm x 100mm) to retain 98% of the wall's original strength.

Key Factors for Long-Term Success

Final checks are critical to ensure the installation holds up over time:

  • Verify that the frame alignment stays within a 2mm variance using digital levels.
  • For coastal areas, apply protective measures to guard against corrosion.
  • Professional certification often meets insurance requirements and helps avoid future complications.

Additionally, keeping thorough documentation of all installation and maintenance activities is crucial for warranty compliance. Record details such as dates, materials, and testing results to avoid potential issues down the line.

FAQs

Can you put windows in a shipping container?

Yes, you can install windows in a shipping container, but it requires careful planning and adherence to safety and structural guidelines. Here's what you need to know:

Frame Options and Costs:

  • DIY materials for window installation usually range from £150 to £300, with an added 40% cost for corrugated surfaces.

Safety Requirements:

  • Most municipalities in the U.S. require permits for openings larger than 5 square feet.
  • For bedrooms, windows must meet safety codes. This includes a minimum opening of 5.7 square feet (dimensions: 20" width × 24" height) and a maximum sill height of 44 inches.

Structural Tips:

  • Avoid cutting openings on opposite walls of the container at the same time to maintain structural integrity.

DIY vs Professional Installation:

  • For coastal areas, aluminum frames are recommended due to their superior corrosion resistance - 85% better than vinyl. Ensure frame measurements meet the ±1/8" tolerance outlined in the Window Placement Guide.

Related Blog Posts

Previous article Container Door Maintenance: Complete Checklist
Next article Top Self Storage Equipment to Enhance Your Facility

Compare products

0 of 3 items selected

Select first item to compare

Select second item to compare

Select third item to compare

Compare